Hoja de referencia de doblado

A conduit bending cheat sheet to print and tape in the lid of the box: the offset multipliers and shrink for 10° to 60°, the marks for the rises you bend every day in inches and millimetres, every bend in one line, and blanks for your own take-ups. Everything on this sheet is geometry, so it is true on any bender and any pipe. The blanks at the bottom are the figures that are not — your bender's take-ups — because those come off your shoe, not off a chart. Print it, fill the blanks in pencil, tape it in the lid of the box.

Multipliers and shrink

Between marks = rise × multiplier. Shrink = rise × shrink factor — add it to the overall LENGTH, not to mark 1. Both are plain ratios, so they work the same in inches or millimetres. Shop rules are the rounded figures for doing it in your head; the exact column is what the calculators use. The shop shrink column is computed here from the angle — the exact figure rounded up to the next sixteenth on purpose, so a mental layout errs long rather than short. That makes it heavier at every angle than the shrink figures most shop cards carry, so if you are comparing with someone else's card, that is why, and the difference is always in the safe direction. The shop multiplier column is not a rounding rule at all: those are the numbers the trade says out loud, and ×6 and ×3.9 are a shade heavy while ×2.6, ×1.4 and ×1.15 are a shade light. On a phone this table scrolls sideways — the last two columns are the saddle ones.

ÁnguloMultiplierShop ruleShrink factor (× rise)Shop shrink (in per in)As a saddle centre: outersOuter multiplier
10°5.75960.0871/85°11.474
15°3.8643.90.1323/167.5°7.661
22.5°2.6132.60.1991/411.25°5.126
30°2.00020.2685/1615°3.864
45°1.4141.40.4147/1622.5°2.613
60°1.1551.150.5775/830°2.000

Multiplier = 1 ÷ sin θ. Shrink factor = 1 ÷ sin θ − 1 ÷ tan θ (per inch of rise in inches, per mm of rise in mm). Saddle: centre-to-outer = depth × the outer angle's multiplier. Both saddles eat twice the offset shrink of their sloped angle; the three-point's centre-mark correction is one offset's worth of it. Any other angle: the multiplier calculator.

Marks for common rises

Between marks for an offset at each angle, and the shrink to add to the length. Marks are rounded to the nearest sixteenth or millimetre; shrink is rounded up, so the run errs long. Any rise not here: the offset calculator.

In inches (mm alongside)

Altura22.5° marks30° marks45° marks30° shrink45° shrink
1" / 25 mm2 5/8" / 66 mm2" / 51 mm1 7/16" / 36 mm5/16" / 7 mm7/16" / 11 mm
2" / 51 mm5 1/4" / 133 mm4" / 102 mm2 13/16" / 72 mm9/16" / 14 mm7/8" / 22 mm
3" / 76 mm7 13/16" / 199 mm6" / 152 mm4 1/4" / 108 mm13/16" / 21 mm1 1/4" / 32 mm
4" / 102 mm10 7/16" / 265 mm8" / 203 mm5 11/16" / 144 mm1 1/8" / 28 mm1 11/16" / 43 mm
5" / 127 mm13 1/16" / 332 mm10" / 254 mm7 1/16" / 180 mm1 3/8" / 35 mm2 1/8" / 53 mm
6" / 152 mm15 11/16" / 398 mm12" / 305 mm8 1/2" / 216 mm1 5/8" / 41 mm2 1/2" / 64 mm
8" / 203 mm20 7/8" / 531 mm16" / 406 mm11 5/16" / 287 mm2 3/16" / 55 mm3 3/8" / 85 mm
10" / 254 mm26 1/8" / 664 mm20" / 508 mm14 1/8" / 359 mm2 11/16" / 69 mm4 3/16" / 106 mm
12" / 305 mm31 3/8" / 796 mm24" / 610 mm17" / 431 mm3 1/4" / 82 mm5" / 127 mm

In millimetres

For a metric job, round-millimetre rises. Nothing to convert and no fractions: read the figure straight off a millimetre tape.

Altura22.5° marks30° marks45° marks30° shrink45° shrink
25 mm / 1"65 mm50 mm35 mm7 mm11 mm
50 mm / 1 15/16"131 mm100 mm71 mm14 mm21 mm
75 mm / 2 15/16"196 mm150 mm106 mm21 mm32 mm
100 mm / 3 15/16"261 mm200 mm141 mm27 mm42 mm
150 mm / 5 7/8"392 mm300 mm212 mm41 mm63 mm
200 mm / 7 7/8"523 mm400 mm283 mm54 mm83 mm
250 mm / 9 13/16"653 mm500 mm354 mm67 mm104 mm
300 mm / 11 13/16"784 mm600 mm424 mm81 mm125 mm

The bends, one line each

Doblez a 90° (stub)
Mark = height − take-up, from the end. Arrow on the mark, measured end on the hook side, pull to square. calc
Offset
Mark 1 = layout measurement. Mark 2 = mark 1 + rise × multiplier. Both on the arrow, same angle, pipe rolled a half turn between, one plane. Shrink goes on the overall length. calc
Silla de tres puntos
C = centre measurement + one offset's shrink (the crown sits that much back along the bent pipe), on the notch, centre angle. Marks 1 and 2 = depth × outer multiplier either side of C, on the arrow, half the angle, the other way. The saddle eats twice that shrink out of the length. calc
Silla de cuatro puntos
Mark 1 = layout measurement. 2 = 1 + depth × multiplier. 3 = 2 + obstruction width. 4 = 3 + depth × multiplier, all measured from 1. Shrink (two offsets' worth) goes on the overall length. All on the arrow. calc
Back-to-back
Mark 1 = height − take-up, on the arrow. Bend it, then mark 2 = the back-to-back distance measured from the back of that 90 (or pre-mark it at height + distance − gain), on the star, hook facing the first 90. calc
Kick 90
90 mark = height − take-up, arrow. Kick mark = kick rise ÷ sin θ down the tail, arrow, same plane. Pull the corner to 90° − kick angle so the stub stands plumb. calc
Offset rodado
True offset = √(rise² + roll²); roll angle = atan(roll ÷ rise). Lay out as an offset of the true offset with the pipe turned by the roll angle for both bends. calc
Offset de caja
Two small bends at a shallow angle, on the arrow: marks = depth × that angle's multiplier. 22.5° (×2.613) is what the calculator opens on; 10° (×5.759, shop ×6) if your shoe carries a line that shallow. calc
Doblez segmentado
Angle per bend = total ÷ count; spacing = 2 × radius × tan(half the per-bend angle); lay every mark out from one end. calc
Take-up (find yours)
Mark a scrap at a round figure, bend a 90 on the arrow, stand it up: height to the back − mark = take-up. calc

Bender references

  • Arrow — the start of a bend: stubs, every offset mark, saddle outers, kicks.
  • Notch (rim) — the centre of a 45: the middle mark of a three-point saddle. Check it once on scrap.
  • Star — the back of a 90: the second mark of a back-to-back.
  • Degree lines — read from the side, level with the shoe; pull a touch past for springback, the same touch on both bends of an offset.
  • Hook — toward the end you measured from.

My bender

Fill in from your own test bends — measure your bender says how. One line per shoe and pipe. Saved them on the site? Print them as a pocket card with the stub marks worked out.

Bender / pipeTake-upGananciaDesfase de muescaRecuperación elástica
 
 
 
 
 
 

Before every pull

  1. Rise centre to centre.
  2. Shrink added to the overall length (never to mark 1).
  3. Multiplier and angle from the same line.
  4. Take-up is mine, for this shoe and pipe.
  5. Right reference: arrow, notch, or star.
  6. Measured end on the hook side.
  7. Line all the way round the pipe.
  8. Foot on, then pull; sight down it before the second bend.

What is not on this sheet is the Code: bends per run between pull points, minimum radius, support spacing, fill. Those are the book's and the inspector's. bentright.com/bending-cheat-sheet

¿Ve algo incorrecto en esta página? Repórtelo

Incluiremos esta página y los números que usted escribió. Leemos cada reporte, pero no podemos responder.

Gracias — su reporte fue enviado.

No se pudo enviar. Vuelva a intentarlo más tarde.